Sap2000: Consideraciones al utilizar el comando Insertion point

Started by ralarcon, 16 de August de 2010, 09:04:54 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

ralarcon

Consideraciones para tener en cuenta al utilizar el comando insertion point

From CSI Tutorials

Consider  a beam that has pin supports at both of its end. The beam is loaded by a point  load in gravity direction applied at the midspan of the beam. The  following 2 cases are being considered:   

       
  • Case 1: The beam is created       with default (centroid, 10) insertion point.

       
  • Case 2: The beam is created       with top-center (top, 8 )  insertion point.